Event → Build Plan → Assign Owners → Track Dependencies → Escalate Delays
Workflow Orchestrator
Turns a triggering event like a move-out into a full task plan: assigns each step an owner, tracks the dependencies between them, and escalates the moment a step runs late, so a turn runs off a live plan instead of a spreadsheet and a manager's memory.
The Problem
A spreadsheet and a manager's memory run the turn.
Turns are managed in spreadsheets. Steps get missed. Managers chase every task manually.
What Changes
A live plan runs it. Only the slips surface.
Converts the turn event into a full task plan - cleaning, repairs, QA, listing - with owners, dependencies, and deadlines. Escalates delays before they cascade.
Humans stay in control: Your manager owns the plan and makes the calls on delays. The agent builds the task plan, tracks it, and surfaces what's slipping. It removes the manual chasing, not the management.
HOW THE AGENT WORKS
HOW TO BUILD IT
Three levels of depth. Pick the one that matches where you are.
For the ops person who needs to understand what's involved and brief their team.
WHAT YOUR TEAM PROVIDES ONCE
- Task templates - the standard steps for each event type
- Ownership map - who owns which task or team
- Dependency rules - which steps block which
- Timing targets - how long each step should take
- Escalation rules - when a late step gets surfaced and to whom
For the IT person or technical lead who needs to scope the integration.
INQUIRY SOURCES
WORKFLOW ENGINE (N8N)
CONNECTS TO
Agent generates the plan to a shared sheet and sends scheduled status checks. Less real-time, but the plan-building and escalation logic still run.
Agent builds and tracks the plan live on your board and escalates delays in real time. Best experience and a natural hub over the other turn agents.
For the person who wants to build this agent step by step. Each node below maps to an n8n workflow node.
You build a make-ready / turn task plan from an event.
Given the event type, the TASK TEMPLATE, and the OWNERSHIP MAP, return an ordered task list:
- task: the step
- owner_role: from the ownership map
- depends_on: the task that must finish first, or null
- target_days: days allowed for this step
Order by dependency. Respond ONLY with a valid JSON array.
EVENT: {event_json}
TASK TEMPLATE: {task_template}
OWNERSHIP MAP: {ownership_map}{ "event_type": "move_out", "unit_id": "B-214", "event_date": "2026-06-20" }[
{ "task": "Final inspection", "owner_role": "inspector", "depends_on": null, "target_days": 1 },
{ "task": "Build scope from inspection", "owner_role": "turn_coordinator", "depends_on": "Final inspection", "target_days": 1 },
{ "task": "Dispatch trades", "owner_role": "turn_coordinator", "depends_on": "Build scope from inspection", "target_days": 1 },
{ "task": "Make-ready work", "owner_role": "vendor_crew", "depends_on": "Dispatch trades", "target_days": 4 },
{ "task": "QA / rent-ready check", "owner_role": "supervisor", "depends_on": "Make-ready work", "target_days": 1 }
]- Single event type (move-out)
- Fixed task template
- Owners from a static map
- Plan on a shared sheet
- Manual progress checks
- Delay flags by email
Full Video Walkthrough Coming Soon
From a move-out event to a tracked plan - step by step.
Register to be notifiedEverything on this page is free to learn.
When you're ready to build — do it yourself or bring us in.
OTHER AGENTS IN LEASING & MARKETING
Turnover Next Step Agent
Inspection-to-Scope Builder
Turn Critical Path Risk Detector
Turnover Coordinator
Frequently asked questions
This is 5 of 5 agents in Turn Management & Make-Ready. → · Explore all 10 departments →